We get auto lifts installed for shops, dealerships, and home garages across Iowa every week. Whether it is a single two-post going into an independent shop in Ankeny or three lifts landing at a body shop in the Des Moines metro on the same visit, our install crew shows up with the anchors, the shims, the torque wrench, and the concrete knowledge to do the job right the first time. Auto Lift Services is based in Ames, Iowa, and we cover the whole state — Sioux City, Cedar Rapids, Iowa City, Waterloo, Council Bluffs, and every farm town in between.
Get a real quote with your slab specs, ceiling height, and lift model. Our team schedules most jobs within two weeks.
What our team actually does when we get auto lifts installed
Getting auto lifts installed is not the same as bolting a bookshelf to drywall. There is a slab-thickness check, a rebar-and-cure verification if the pour is new, a ceiling-height measurement against the manufacturer’s rise plus vehicle plus buffer, and a plumb-and-level shim job on the columns that decides whether the arms swing true for the next twenty years. We bring the impact hammer, the diamond core bit for existing floors, the anchor kit that matches the lift make, and a full torque spec sheet.
On a typical two-post drop-in, a crew of two spends most of a full day per lift once electrical is already run. On a job like a small shop in northern Iowa where we had two two-post lifts scheduled back-to-back over two days, that timing lines up with an eight-hour install per column pair plus function-test, arm-sweep test, and safety-lock cycle before we hand you the keys.
Iowa coverage: where we get auto lifts installed
Our shop is in Ames, so we are within about ninety minutes of Des Moines, Ankeny, Boone, Marshalltown, Nevada, and Story City. From there we cover the rest of the state on regular routes — Cedar Rapids, Iowa City, and Coralville trips run several times a month, Waterloo and Cedar Falls we hit whenever there is a cluster of work, and we swing west to Sioux City and Council Bluffs when we can group two or three jobs together to make the drive pencil out.
We have also gotten auto lifts installed at small shops in towns most installers will not drive to — the independent repair operations in Aurelia, Centerville, Colo, and Parkersburg where the nearest big-city installer is three hours and a fuel-surcharge away. If you can pour the pad and pull the power, we can put the lift on it.
Concrete, power, and ceiling: prep before install day
Before we roll a truck, we want the concrete right. For a 10,000-lb two-post, most manufacturers spec at least 4.25 inches of 3,000-PSI concrete cured a minimum of 28 days. A four-post is more forgiving because the load spreads across four base plates, but you still want a solid slab. If you are pouring new, get us the lift model first so we can send you the exact pad plan — a wrong pour is a $6,000 mistake.
Electrical is the other prep item. Most two-posts run on single-phase 220V pulling around 20-30 amps, so a dedicated breaker and a disconnect near the power unit is standard. Ceiling height depends on lift rise plus your tallest vehicle plus a foot of buffer — twelve feet is usually the practical minimum. We walk through all of it on the quote call before we ever load anchors on the truck.
Two-post, four-post, and scissor: install differences
Most of the auto lifts we install are two-post symmetric or asymmetric — the workhorse of general repair shops and the most common lift type in Iowa’s independent garages. Four-posts show up most often in home garages for storage plus the occasional oil change, and in alignment bays where the runways carry the pinch. Scissor and mid-rise lifts land in tire shops, quick-lubes, and detail garages that need a low-profile lift they can walk around.
Each type has its own install rhythm. Two-posts need overhead-cable timing, chain-tension setup, and arm-restraint break-in. Four-posts need cross-tube square-check and cable-slack equalization. Scissors need the pit or surface-mount version confirmed, plus the pump and hose run. Our team has gotten thousands of auto lifts installed across all three configurations, so the checklist is muscle memory.
How long does the install actually take
For a single two-post drop-in on cured concrete with power already run, plan on 6-8 hours from truck-unload to arm-sweep test. Add a couple of hours if we are core-drilling through post-tension slab or breaking out old anchors from a lift that was already there. A four-post is a little longer on setup but often finishes in the same day because there is no overhead-cable routing.
Multi-lift jobs stretch across multiple days but scale efficiently. We had one recent Iowa job that put three lifts in a shop over two consecutive days — two two-post service lifts and prep for a third. That kind of grouping saves the customer on trip charges because we are already onsite. If you have friends or neighboring shops planning installs in the same window, tell us and we can quote it as one visit.
Brand matters when getting auto lifts installed
We sell and install what we would put in our own shop: Rotary, Challenger, and PKS for heavy-duty commercial work; BendPak and Atlas for home garages and hobbyist bays. All of them ship with proper install manuals, real torque specs, and a warranty that means something when you call the manufacturer three years in. Getting auto lifts installed from that shortlist means we already know the anchor pattern, the shim kit, and the quirks of that specific column design.
We occasionally get called to install off-brand lifts a customer bought elsewhere — sometimes an Amazon import from overseas with a translated manual and no real parts support. We can usually still install those, but we will be honest up front about what parts support looks like when a cable or hose fails two years later. Learn more in our ALI certified car lift guide.
Getting a real quote for auto lifts installed at your shop
The fastest path to a real number is a five-minute call. We ask for the lift model (or the shop use-case if you are still shopping), the address so we can price the drive, the slab thickness and cure date, ceiling height, and whether the electrical run is already there. From that we quote install labor, anchor kit, any drilling, and delivery of the lift itself if we are supplying it. If you want to talk through the buy first, browse our full lift catalog or check our garage lifts installed overview.
Call 800-674-9302 or email founder@autoliftserv.com and we will get you on the schedule. Most quoted jobs get auto lifts installed within two to three weeks of the go-ahead, faster in slow months, longer in the spring push. If you have a hard deadline — a shop opening, an insurance re-inspection, a new mechanic starting — flag it on the first call so we can plan the route.

Our Clients Include: