When a heavy-duty truck shop in Ankeny plans a new bay, the 2 post car lift is one line on a longer cost sheet — and the surrounding line items usually add up to more than the lift itself. We are Auto Lift Services in Ames, and we quote lifts alongside install, electrical, concrete, and equipment sequencing for shops building out new capacity. This breakdown walks through the real cost from the day you sign the lift order through the day you rotate the first set of tires under it, aimed at a heavy-duty operation.

Get a 2-Post Lift Quote →

Sticker plus freight, install labor, and site-specific concrete or electrical — all quoted line-item.

The lift itself: sticker plus freight

A commercial-grade 2 post car lift for a heavy-duty truck shop runs from the low-to-mid four figures on the entry-tier side to well into five figures on the top of the commercial line. Capacity is the biggest driver: a 10,000-pound lift and a 14,000-pound lift can differ by several thousand dollars. Heavy-duty truck shops in Ankeny usually need at least a 12K to handle a fully loaded service truck safely; occasionally a 15K or 18K is warranted. Freight adds a modest but real line — a few hundred dollars for lifts shipped from Illinois plants, more from West Coast plants. That number gets quoted line-item on the invoice; there is no hidden freight in the sticker. Tax applies based on delivery address, which for an Ankeny shop is Iowa sales tax at the current rate. We do not mark up freight or tax; both pass through. What is included in the sticker: columns, overhead beam or baseplate, arms, arm pads, hydraulic pump, hoses, and the anchor kit. What is not: labor, electrical, and any concrete work. Those are separate quotes.

Delivery and unloading in Ankeny

Delivery to Ankeny from our Ames warehouse is a short haul — we usually schedule same-week for stocked items and two-week windows for factory-direct shipments. The delivery truck is typically a 48-foot flatbed or a straight truck; either can navigate most Ankeny industrial streets, but you should confirm the truck can reach your dock without a low bridge or a tight turn. For a heavy-duty truck shop with an existing forklift, unload adds nothing to the delivery cost — the driver stages, your forklift lifts. If you do not have a forklift, we quote a liftgate delivery or a white-glove unload as separate line items. The unload takes about thirty minutes for a standard 2 post car lift crate. Once inside, the crate lives on the floor until the install day; we do not open the crate before install because open crates lose the packing list and small parts fast. If your shop schedule requires a Friday-afternoon drop-off, tell us at order time and we route accordingly. There is no premium for scheduled delivery windows within our normal service area.

Concrete work if the bay is not ready

If your bay’s slab meets the manufacturer minimum (usually four inches of solid concrete at least three thousand PSI, or six inches for the heaviest commercial lifts), concrete adds nothing to the project cost. If the slab is under spec, footings under each column run in the low four figures typically — that is honest cost for cutting the existing slab, digging, forming, pouring, and curing. It is a two-day job with a cure delay of about a week before the lift can be anchored. Some Ankeny shops in older buildings need this; most newer commercial buildings have slabs that exceed the minimum. We inspect on the front end so you know before ordering. If the slab is new or freshly poured, we wait for the twenty-eight-day cure before anchoring; that is not a cost line, it is a schedule line. The cost bump for a heavy-duty install is usually the added slab thickness — a 15,000-pound-capacity lift on a truck-shop floor often wants six inches, which may mean cutting and re-pouring even if the existing floor is a solid four.

Electrical: 220-volt versus three-phase

Most heavy-duty commercial 2 post car lift models run on either single-phase 220-volt or three-phase 220 or 480-volt power, depending on the pump. Three-phase pumps cycle faster and pull cleaner power under load, which matters for a high-volume tire-rotation and service operation. If your Ankeny shop has three-phase from the co-op or the utility, quote the three-phase model — the cost delta on the pump is small and the cycle time savings compound. If you have single-phase only, a rotary phase converter can generate synthetic three-phase for around a thousand dollars, or you can stay on single-phase pumps and accept the slightly slower cycle. Electrical run to the lift itself — outlet, disconnect, and breaker — usually runs a few hundred dollars if your panel is close and has capacity, and up to a couple thousand if you need a new sub-panel or a long run. Get a real quote from a licensed electrician before you finalize the lift order; we do not do electrical work but we know what the lift needs and we work with the electrician on the specs.

Installation labor and anchoring

Installation labor on a 2 post car lift is roughly a one-day job for a two-person crew — call it eight to ten hours from crate to first vehicle. We install lifts across central Iowa for a flat labor fee that varies with the lift model and site conditions (mostly the concrete work needed and how far we are traveling). For a straightforward Ankeny install with a ready slab and clean access, install labor is a well-defined line item that we quote up front, not an hourly meter running. What we do: uncrate, set columns, plumb and level, anchor with a calibrated torque wrench, install the overhead beam or baseplate, hang arms, install the pump and hoses, wire up, prime the hydraulics, bleed, and run a lift-lower cycle with a test load. What we do not include: your electrical hookup (electrician), any concrete work (concrete crew), and disposal of the crate (we can take it if you want, added charge). A heavy-duty truck shop can be lifting vehicles the same afternoon we finish anchoring if the electrical was already run.

Tools and consumables to have on day one

Once the lift is installed, you need a few small items to actually work under it. First: proper wheel chocks for vehicles on ramps or dollies while positioning. Second: a set of frame pad adapters for oddball pickup points on heavy-duty trucks — some frame rails do not accept the stock pads without an adapter. Third: enough space around the lift for arms fully deployed and doors fully open. Fourth: a torque wrench for anchor retorque at ninety days (a maintenance step nobody tells you about at sale time — anchors settle slightly under load and want a retorque after their first several dozen cycles). Fifth: hydraulic fluid on hand for topping the reservoir at scheduled service intervals — a five-gallon pail of ISO 32 hydraulic fluid runs modest money and lasts most shops a couple years. None of these are big-ticket items; together they add a few hundred dollars to the day-one cost. A 2 post car lift is not maintenance-free, but the day-to-day consumables are modest and predictable.

Sequencing the 2 post car lift build-out so nothing waits

The single biggest cost driver in a new bay build-out is dead time. If the concrete is poured before the electrical is run, the electrical crew works around fresh anchors. If the lift arrives before the electrical is ready, the crate sits. If the electrical arrives before the concrete is cured, the crew has to come back. The right sequence for an Ankeny heavy-duty shop looks like this: measure and quote the lift and site, pour or repair concrete if needed, wait cure, run electrical, take lift delivery, install lift, connect and test. We coordinate the pieces we control and the ones we do not, and we tell you honestly which trades to schedule when. Related reading: our concrete-slab guide, our freight and unloading article, and our arm-configuration deep-dive cover the technical decisions inside each of these line items. Every install we quote for a truck shop includes a sequenced schedule, not just a lift price. Call 800-674-9302 or email us and we will walk through your build-out timeline with you before you sign anything.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email founder@autoliftserv.com.