Looking for an Automotive Lift for sale? 

Experience America’s Highest and Most Reviewed Car Lift Installation, Repair, Inspection, and Hydraulic Cylinder Service Company Today!

Car Lift Repair Ames Stars

Read Reviews Buy a Lift

Our Clients Include:Social Proof Car Lift Repair Ames Auto Lift Services

Rotary 7000 Lb 2 Post Lift for Race Teams: A Garage Build-Out Decision Tree

Alignment Machine For Sale Boca Raton, FL

Contact Us

As a crew chief building out a race shop in the Des Moines metro, you already know that suspension and shock replacement between race weekends eats more shop hours than anything else on the car, and a Rotary 7000 lb 2 post lift is the piece of equipment that determines whether that work goes fast or drags. We’re Auto Lift Services, based in Ames, and we’ve helped race teams across central Iowa work through exactly this decision — starting with budget and working through to a final configuration that matches how your crew actually works on cars. This article lays out that decision tree step by step.

Shop 2 Post Lifts →

Browse Rotary configurations built for race shops around Des Moines, and get a straight answer on which setup fits your budget and bay.

Step One: Set a Real Budget Before You Look at Specs

Every race team we talk to in the Des Moines metro starts the conversation with a capacity number, but we always redirect to budget first, because budget determines which configurations are even on the table. A Rotary 7000 lb 2 post lift sits in a middle tier — more capable than entry-level home-garage lifts, but priced well below the heavy commercial units built for medium-duty trucks. For a race team whose heaviest vehicle is a full-bodied stock car or a loaded trailer-prepped chassis, that middle tier usually has the right capacity margin without paying for tonnage you’ll never use.

We tell crew chiefs to separate the lift budget from the rest of the garage build-out — concrete work, electrical service upgrades, lighting, and tool storage all compete for the same dollars. Teams that lock in a lift budget early avoid the trap of downgrading lift quality to pay for garage aesthetics later. A Rotary 7000 lb 2 post lift purchased with financing or a straightforward payment plan often fits better into a race team’s cash flow than teams initially assume, especially when you separate it from the rest of the build-out costs.

Step Two: Decide Symmetric or Asymmetric for Suspension Work

Once budget is set, the next fork in the decision tree is arm configuration. Suspension and shock replacement work benefits from good arm reach to the pickup points on a race chassis, which tends to favor asymmetric column placement with longer front arms. That said, a lot of Des Moines area race teams run symmetric configurations successfully, especially if the crew is used to a specific arm swing pattern from a previous shop or borrowed bay at the track.

The honest answer here is that either configuration on a Rotary 7000 lb 2 post lift will get suspension work done — the difference is efficiency, not capability. Asymmetric setups shave a few seconds off arm positioning on longer cars and give the driver door more clearance, which matters if your crew is constantly getting in and out of the car mid-job to check ride height or clearance. If your race garage will only ever house short-wheelbase cars, that advantage shrinks and symmetric becomes the simpler, slightly cheaper choice.

Step Three: Match Ceiling Height and Bay Width to the Lift

Race garages built in pole barns or converted outbuildings around the Des Moines metro often have ceiling heights that weren’t planned around a two post lift. Before finalizing any configuration, measure your actual clear ceiling height at the lift location, not just the peak of the building — column height plus overhead safety mechanisms need real clearance for the lift to raise a car to a comfortable working height. We’ve had race teams order a lift only to find the ceiling in their intended bay location is a foot lower than they assumed.

Bay width matters just as much, especially if the plan includes rolling toolboxes, a parts washer, or a second vehicle staged nearby during a race weekend crunch. We recommend crew chiefs walk their bay with tape measure in hand and mark out the full swing radius of the arms before ordering, not after. This step alone eliminates the most common installation surprise we run into with race team garages — a lift that technically fits but leaves no room to actually work around the car.

Step Four: Plan the Concrete and Electrical Before Delivery

A Rotary 7000 lb 2 post lift needs adequately rated concrete to anchor safely, and a lot of older pole barn slabs in rural areas around Des Moines don’t meet the thickness requirement without additional work. We check this during every site visit, because anchoring a two post lift into undersized concrete is a safety issue, not a minor inconvenience. If your garage build-out includes new concrete, pour it to lift specifications from the start rather than guessing and hoping it works.

Electrical needs are simpler but still worth planning — most Rotary lift power units run on standard shop voltage, but you’ll want a dedicated circuit rather than sharing with welders, compressors, or lighting that could trip a breaker mid-lift. Race teams often add welding and fabrication equipment to the same garage, so sequencing the electrical panel work before lift installation avoids having to reopen walls or conduit runs later in the build-out.

Step Five: Choose Installation Timing Around Your Race Schedule

Race teams run on a season calendar, and the worst time to have your lift out of commission for installation is the week before a big event. We work with Des Moines metro teams to schedule installation during off-season or between race weekends, so the bay is fully operational well before you need to turn around suspension work on a tight timeline. A standard Rotary 7000 lb 2 post lift install typically takes our crew a single day once the site is prep-ready.

If your build-out is happening mid-season out of necessity — say, moving into a new shop space — we can often expedite scheduling to minimize downtime, but planning around your race calendar from the start avoids that scramble entirely. Crew chiefs who loop us in early on garage build-out timing get the smoothest installation experience, because we can coordinate delivery, concrete cure time, and installation day around actual open windows in the season.

Step Six: Build In Maintenance for Race-Weekend Reliability

A lift that fails during a critical turnaround week costs a race team more than the repair bill — it costs track time. High-frequency suspension and shock replacement work puts real cycles on cables, hydraulic seals, and arm pivots, so we recommend race teams treat lift maintenance with the same seriousness as engine maintenance. Regular visual inspections for cable wear, hydraulic leaks, and arm pad condition catch small issues before they become a lift going down mid-season.

We offer maintenance visits and priority service scheduling for Des Moines metro teams so that if something does go wrong, you’re not waiting in a general service queue during your busiest weeks. Because we stock Rotary parts locally, replacement cables, arm pads, or hydraulic components are typically available fast rather than tied up in cross-country freight. For a race team, that turnaround time can be the difference between missing one event or getting back on track without losing the season.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email founder@autoliftserv.com.

Get in Touch

Schedule Your $1 First Service Call!