Looking for an Automotive Lift for sale? 

Experience America’s Highest and Most Reviewed Car Lift Installation, Repair, Inspection, and Hydraulic Cylinder Service Company Today!

Car Lift Repair Ames Stars

Read Reviews Buy a Lift

Our Clients Include:Social Proof Car Lift Repair Ames Auto Lift Services

Install Day Checklist: What to Have Ready Before We Arrive

Alignment Machine For Sale Boca Raton, FL

Contact Us

An install day checklist is the difference between a lift going in smoothly in a few hours and a crew standing around waiting on things that should have been handled a week earlier. We’ve rolled trucks out across Iowa for home garages, dealership service bays, and heavy-duty commercial shops, and the jobs that go fastest are always the ones where the shop worked through an install day checklist before we ever showed up. This guide walks through exactly what we need on-site, what you should have ready, and the small things that trip up otherwise-smooth installs.

Browse Lifts & Parts →

Whether you’re prepping for a new 2-post, 4-post, or scissor lift install, our team can help confirm anchor bolts, cables, and accessories are on hand before install day.

Why an Install Day Checklist Matters

Every lift install has a fixed set of variables: floor condition, power supply, clearance, and access. When those variables are confirmed ahead of time, our crew walks in, verifies measurements, and starts bolting things together. When they’re not confirmed, we spend the first hour of a scheduled install diagnosing problems that a five-minute walkthrough the week before would have caught. That’s wasted time you’re paying for, and it’s avoidable.

We send an install day checklist to every customer scheduling a lift with us specifically because it saves both sides money and frustration. A shop in central Iowa once scheduled a two-post install without realizing their compressor was on the opposite end of the building from where the lift was going — we had to reroute an air line mid-install, adding hours to what should have been a half-day job. That’s the kind of thing an install day checklist catches in advance rather than in the moment. Whether you’re installing your first home garage lift or your fifth commercial bay, working from the same checklist keeps expectations aligned and the schedule on track.

Confirm Floor Thickness and Condition

Concrete is the foundation of every lift install, literally. Before install day, we need to know the slab thickness, age, and condition of the floor where the lift is going. Most two-post and four-post lifts need a minimum slab thickness with proper PSI rated concrete that hasn’t been patched or resurfaced in that specific spot. Cracks, expansion joints, and previous anchor holes within a few inches of your planned bolt pattern can all be dealbreakers.

If you’re not sure about your slab, we’d rather find out during the pre-install conversation than have our installer discover it once anchors won’t torque properly. Have any documentation on your slab pour available, and if your shop is older or previously used for something other than automotive work, mention that up front. This single item on the install day checklist prevents more delayed installs than anything else we run into.

Verify Power and Air Requirements

Lifts need power, air, or both depending on the model. Two-post and four-post lifts typically run on standard shop voltage, while some larger commercial units need higher voltage circuits run specifically for the equipment. Confirm with your electrician beforehand that the circuit is in place, tested, and located within reasonable distance of the lift’s planned position.

Air-operated locks and accessories need a compressor line nearby too. Walking through this section of the install day checklist with your electrician and facilities person ahead of time means our crew isn’t waiting on someone else’s schedule while the truck idles in your lot. It also means you’re not paying us to wait.

Clear the Bay and Confirm Clearance

Ceiling height, door clearance, and floor space around the install area all matter, and they’re all things you control before we arrive. Measure ceiling height at the exact spot the lift will sit, not just somewhere in the bay — older buildings often have uneven ceiling heights or low-hanging ductwork and sprinkler lines that aren’t obvious until a lift’s superstructure is going up.

Clear the bay completely of parts bins, tool chests, and vehicles that aren’t part of the install. Our crew needs open floor space to stage the lift components, run cables, and maneuver equipment safely. This is one of the simplest items on any install day checklist, but it’s also one of the most commonly skipped — shops get busy and the bay doesn’t get cleared until the truck is already backing in.

Gather Anchor Bolts, Cables, and Accessories

Every lift ships with the hardware it needs, but replacement parts, upgraded cables, or additional accessories ordered separately need to be on-site and accounted for before install day. Double-check your packing lists against what actually arrived, and flag any shortages with us well before the scheduled date rather than the morning of.

We keep cables, anchor bolts, and hydraulic parts in stock specifically because last-minute gaps happen, but building this into your install day checklist ahead of time means we’re not making a parts run mid-install. If you ordered a lift with optional accessories like tire trays or rolling jacks, confirm those arrived too — it’s easy to overlook add-ons buried in a larger shipment.

Confirm Access and Scheduling Logistics

Our crew needs a clear path from the truck to the install bay, and they need someone on-site who can make decisions if something unexpected comes up. Confirm building access, gate codes, and who will be present on install day. If your shop has specific hours or loading dock restrictions, let us know before we schedule the crew.

This part of the install day checklist is easy to overlook because it feels administrative rather than technical, but a crew standing at a locked gate for twenty minutes adds up across a full day of scheduled installs. A few minutes confirming logistics saves everyone a headache.

Walk Through Final Documentation and Training

Once the lift is installed, there’s a final step that’s part of every install day checklist: reviewing documentation, warranty registration, and basic operating training with whoever will be running the lift day to day. Don’t let the crew leave without walking through the controls, safety locks, and maintenance schedule at least once.

We also recommend keeping a copy of your install day checklist and the final inspection notes on file. If you ever need warranty service or run into a question down the road, having that paperwork ready saves time. For more detail on pre-install prep, our pre-install checklist and two-post install day checklist cover model-specific requirements in more depth.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email [email protected].

Get in Touch

Schedule Your $1 First Service Call!