Looking for an Automotive Lift for sale? 

Experience America’s Highest and Most Reviewed Car Lift Installation, Repair, Inspection, and Hydraulic Cylinder Service Company Today!

Car Lift Repair Ames Stars

Read Reviews Buy a Lift

Our Clients Include:Social Proof Car Lift Repair Ames Auto Lift Services

Forward 9000 2 Post Lift for Oil Service Install Prep

Alignment Machine For Sale Boca Raton, FL

Contact Us

If you’re a foreman trying to figure out whether a forward 9000 2 post lift is the right call for a dedicated oil change and fluid service bay, you’re asking the right question before you spend money instead of after. We install and service these lifts all over the Iowa Great Lakes region, from quick lube bays in Spirit Lake to dealership service drives near Okoboji, and the biggest factor in whether the install goes smoothly isn’t the lift itself — it’s whether the bay was actually surveyed and prepped before the truck shows up. This guide walks through what that prep actually looks like.

Shop 2-Post Lifts →

Browse asymmetric two-post lifts built for fast-paced oil change and fluid service bays, then talk to our Iowa install team about your site survey.

Why Foremen Keep Landing on the Forward 9000 for Quick Service Bays

We hear from a lot of service managers and foremen who run high-volume oil change and fluid service lanes, and the forward 9000 2 post lift keeps coming up as the workhorse choice. It’s an asymmetric two-post design, which matters a lot in an oil change bay because the offset columns let a tech open both doors fully and walk straight to the drain plug without ducking under an arm. For a bay doing multiple vehicles an hour, that few seconds of extra clearance adds up over a shift.

We’ve serviced Forward lifts at dealerships across the state — a Forward 9000A at a Chevrolet store in central Iowa, a Forward DPO9A2 running the same duty cycle at another location, and older I10 and I10N models still grinding through daily fluid work at Buick and GMC stores. The pattern we see is that these lifts hold up well for years of oil-change duty as long as the arms, pump, and columns get routine attention. When something does go — a slow pump, a leaking cylinder, a slider that’s worn thin inside the column — it’s almost always tied to duty cycle, not a design flaw. That’s a reasonable trade for a lift built to move cars fast all day long.

The Site Survey We Actually Run Before Quoting an Install

Before we ever put a number on paper for a forward 9000 2 post lift install, we walk the bay in person or ask for enough photos and measurements to do it right remotely. We’re checking ceiling height with the vehicle raised to full working height, not just the ceiling itself — a lifted pickup or van needs real headroom, and we’ve had to redesign more than one bay layout because nobody accounted for that. We also check overhead obstructions: sprinkler heads, ductwork, light fixtures, and door tracks that a raised vehicle or an extended arm could clip.

We measure bay width and depth against the specific footprint of the forward 9000 2 post lift model being quoted, because asymmetric columns need particular clearance to swing doors and walk around the vehicle. We ask about existing floor drains, trench drains, and air and electrical drops, since those often need to move or get capped before columns go in. And we always ask the same logistics questions we ask every customer: do you have a forklift on site, is there a loading dock or clear path from the street, and is there a pit or is this a surface mount. Getting these answers before the truck rolls saves everyone a wasted trip.

Concrete: The Part That Actually Determines Go or No-Go

Concrete is where more installs get delayed than any other single factor, and we say that after installing lifts across small-town Iowa garages and big dealership service drives alike. A forward 9000 2 post lift puts real point-loading on the anchor bolts at each column base, and that load has to transfer into slab that’s thick enough and cured long enough to hold it. We typically want to see at least four inches of properly cured concrete, no visible cracking radiating from the anchor zone, and no old anchor holes or patched sections directly under where the new columns will sit.

If your existing floor is older, has visible spalling, or was poured for a lighter-duty use, we’ll flag it during the survey rather than let you find out during the install. We’ve walked into service bays where the concrete looked fine to the eye but tested soft under a hammer drill, and we’ve had to bring in a concrete contractor before the lift work could even start. Better to know that during the planning phase than the day the columns are supposed to go in. If your bay was poured for a different purpose years ago, budget time for a concrete evaluation as part of your forward 9000 2 post lift project, not as an afterthought.

Power, Air, and Utility Prep Nobody Thinks About Until It’s Missing

Every forward 9000 2 post lift needs a dedicated electrical circuit sized to the pump motor, and we’ve shown up to installs where the only available outlet was a shared 15-amp circuit already running a compressor and a parts washer. That’s not a lift problem, that’s a building problem, and it needs an electrician involved before install day, not during it. We spec out voltage and amperage requirements as part of every quote so your electrician has exact numbers instead of guesswork.

Beyond power, think through where the control box needs to sit for a foreman or tech to reach it without walking around the vehicle, and whether your existing air lines reach the bay if you’re running air tools off the same drop. We also ask about lighting — an oil change bay with a two-post lift needs enough light at working height that a tech isn’t fighting shadows to see a drain plug or a leaking seal. None of this is complicated, but all of it needs to be handled before the columns arrive, and it’s exactly the kind of thing that gets missed when a lift gets ordered without a proper site survey first.

What Freight and Delivery Actually Look Like

A forward 9000 2 post lift ships heavy, broken down into columns, an overhead beam or cable system depending on configuration, arms, and a hydraulic power unit. Freight companies deliver these on a truck that expects either a loading dock or a forklift on site to unload — a residential-style delivery with a liftgate is rarely part of the plan for commercial-grade equipment like this. We ask every customer this question directly during scheduling: do you have a forklift on site, or do we need to arrange one, because showing up without an unloading plan burns hours and sometimes forces a reschedule.

We also talk through lead time honestly. Parts and full units on backorder can run several weeks depending on the manufacturer’s current stock, and we’d rather tell you that up front than have you plan a shop shutdown around a delivery date that slips. If you’re coordinating a bay renovation around this install, build in a buffer. We’ve had customers ready to pour concrete or run electrical the week before delivery only to have the unit itself sit a couple extra weeks in transit — planning around that instead of against it keeps the whole project on schedule.

Anchoring, Leveling, and the First Week of Use

Once the forward 9000 2 post lift is set and anchored, we run a full leveling check between both columns before the first vehicle ever goes up. Even a fraction of an inch of variance between column bases can translate into uneven arm travel over time, and it’s far easier to correct during install than after a lift has been running for a year. We torque anchor bolts to spec, check that the overhead beam or cable routing is tensioned evenly, and cycle the lift empty several times before handing it over.

We also walk the foreman or lead tech through a basic daily inspection routine — checking arm restraints, listening for anything unusual from the pump, watching for slow drift under load — because the lifts that last the longest in high-cycle oil change bays are the ones where somebody’s actually paying attention week to week. A forward 9000 2 post lift that gets that kind of basic attention from day one tends to run for years with only routine service, and that’s really the goal of doing the install prep right in the first place.

When Retrofit or Repair Makes More Sense Than a New Install

Not every situation calls for a brand-new forward 9000 2 post lift. We regularly get calls about older Forward units — I10, I10N, DPO9A2, and 9000A models among them — where the columns and structure are sound but the pump is failing, a cylinder is leaking, or the button won’t respond without repeated pressing. In a lot of those cases, replacing the pump or rebuilding a cylinder gets years more life out of equipment that’s already anchored and proven in that bay, and it’s a fraction of the cost and disruption of a full new install.

If you’re weighing a new install against a repair, we’re happy to look at both sides honestly. Sometimes the columns and structure have earned their keep and just need a mechanical refresh; other times, especially if a bay’s duty cycle has increased or the layout needs to change, a new forward 9000 2 post lift and a proper site survey is the better long-term move. Either way, the same prep principles apply — concrete, power, clearance, and freight logistics all still matter, whether you’re installing new or servicing what’s already anchored in the floor.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email [email protected].

Get in Touch

Schedule Your $1 First Service Call!