Looking for an Automotive Lift for sale? 

Experience America’s Highest and Most Reviewed Car Lift Installation, Repair, Inspection, and Hydraulic Cylinder Service Company Today!

Car Lift Repair Ames Stars

Read Reviews Buy a Lift

Our Clients Include:Social Proof Car Lift Repair Ames Auto Lift Services

A Des Moines Metro RV Shop’s First Year On New Two-Post Lifts

Alignment Machine For Sale Boca Raton, FL

Contact Us

When we delivered a set of automotive two post lifts to a family-owned RV and trailer service shop in the Des Moines metro last spring, the owner had been sitting on the decision for eleven months. He wanted to expand into restoration and metal work on vintage trailers, but the financing math kept spooking him. This is what actually happened in his first year of ownership, told the way he would tell it himself — from the day the freight truck backed into his lot on the north side of the metro to the first serious rocker-panel job he swung under one of the new lifts. It is the story most central Iowa shop owners tell us they want to hear before they sign anything.

Shop 2-Post Lifts →

Rotary, Challenger, BendPak and Atlas configurations in stock, plus in-house install crews serving Iowa, Nebraska and Missouri from our Ames warehouse.

Why He Waited Eleven Months To Pull the Trigger

The reason was not the lift itself — it was the cash. He had three competing quotes for automotive two post lifts sitting on his desk since the previous summer, all within a few hundred dollars of each other. What kept him stuck was the same knot every third-generation shop owner hits eventually. The equipment purchase looked like it might squeeze payroll during the slow February and March weeks when RV service work goes quiet across central Iowa. He did not want to sign for a lift and then find himself explaining to two long-tenured technicians why raises were on hold in the same quarter.

We ended up talking through his monthly overhead line by line on his shop floor, standing next to the twenty-year-old bay he was trying to retire. The single question that unstuck the decision was not about steel or capacity or arm design — it was whether the financing terms could match the seasonality of his revenue. Once we walked through a payment schedule that lined up with his summer restoration billing rather than a flat monthly draft, the math stopped feeling like a threat. He signed the paperwork the following Tuesday afternoon and slept better that night than he had in weeks.

Locking In Financing Terms That Matched the Slow Season

The financing package we structured for his automotive two post lifts had two features most shop owners overlook when they compare offers. First, a ninety-day payment deferral out of the gate, which meant the first invoice did not hit until the second week of June — well after his spring rush had cleared and cash was flowing steady again. Second, a fixed rate on the note that let him predict the number down to the dollar for his tax planning, rather than the floating rate his original equipment dealer had quoted from a stock lender he had never heard of.

The payment schedule itself was structured over sixty months with a modest balloon he could refinance or pay down early depending on how the restoration side of the business grew. When we walked him through amortization on the back of a napkin at his desk, the monthly payment landed inside the operating margin his accountant had already approved. He told us later that the deferral window alone was what let him say yes without a two-hour phone call to his banker. Most owners in his position benefit from the same conversation before they commit, and we walk through it plainly on our two-post lift financing guide.

Delivery Day and What the Freight Truck Actually Brought

Freight day for a pair of automotive two post lifts is not the calm event most owners picture in advance. The tractor-trailer backed onto his gravel apron at seven forty on a Thursday, carrying two crated columns, two crossbeams, four swing arms, a hydraulic power unit and a small pallet of anchor bolts, cables and adapter pads. Total weight was north of thirty-four hundred pounds. He had a five-ton forklift and one apprentice on hand, which was exactly what the freight bill of lading suggested — anything less and unloading turns into a three-hour problem before install even starts.

Our install lead was on the property by eight fifteen, and the shop was operational on both bays by end of day Friday. That included concrete inspection, anchor placement, plumbing the power unit, cable routing, and the ANSI safety check that has to be signed off before a single wheel goes up in the air. He kept the crew fed and asked good questions, and the finished install looked like it belonged there — plumb columns, tight cable tension, and clean concrete around every base. It was a boring, uneventful install, which is the highest compliment we can offer.

The First Metal Job Under the New Lift

Two weeks after commissioning, he pulled a nineteen seventy-six travel trailer chassis into the shop for what turned into a total belly-pan and cross-member replacement. This was the exact job his old bay could not accommodate — the arms would not reach the frame rail without fighting the trailer’s tandem axles, and he had been quoting the work out to a friend’s shop across town for two years running. On the new automotive two post lifts, he set the arms on the frame in about eight minutes and had a full unobstructed line of sight on the underside of that chassis for the first time in his career.

He cut, welded and re-boxed sections of the cross-members over three long days. He told us later that the single biggest surprise was not the height or the reach — it was how much less fatigued he was at the end of a shift. Standing upright to grind and weld instead of hunched over on jack stands added maybe forty productive minutes to his day. His invoice on that job came in above what he would have paid to sub the work out, and the customer paid without a single question or a nickel of discount asked for.

First Ninety Days on the New Automotive Two Post Lifts

The financing payments were only one line on the ledger. In the first three months of running the automotive two post lifts, he also spent on consumables he had not budgeted — heavier welding wire, a longer air line, a taller drop light stand, and one additional swing-arm restraint that we recommended for oversized trailer frames. None of those items were expensive individually, but together they added a modest first-year overhead line that most shop owners forget to project when they do the initial pencil-and-paper math on the purchase.

On the revenue side, the restoration and metal work he had previously subcontracted came back in-house immediately. Three jobs in the first six weeks alone covered the first six months of lift payments outright, before he had even received a second invoice. By month four he was booking restoration work two weeks out, and the second bay — which he had originally worried would sit idle much of the winter — was being used for standard trailer service between the bigger projects. The economics moved from anxious to obvious inside a single quarter, and he stopped checking the auto-draft every fifteenth.

The Central Iowa Insurance and Permit Question

One thing nobody warns first-time buyers of automotive two post lifts about is the insurance follow-up call. About four weeks after delivery, his commercial policy carrier called to update the schedule of equipment on his liability rider. The conversation was routine — asset value, install date, ANSI certification paperwork on file — and it added a small annual premium bump. What could have gotten expensive was skipping that call entirely. A shop we know in a neighboring county had a claim get dragged out over four months because their lift was not on the policy at the time of the incident.

The permit side in the Des Moines metro turned out to be simpler than he expected. His jurisdiction wanted a copy of the anchor spec sheet and a note from the installer confirming the concrete slab thickness met the manufacturer’s minimum. We had that paperwork in his hands before we left the property on install day, and his building department signed off in under two weeks. Not every county in Iowa is that responsive, but planning for the paperwork before delivery is what keeps the process short — a topic we cover in our lift permits and insurance article.

What He Would Do Differently in Year Two

Twelve months in, we sat with him for an honest debrief in the same corner of the shop where the deal had originally been signed. His first change: he would order the taller three-stage arms from day one instead of the standard two-stage set. On tall trailer frames and lifted pickups, he was running the arms near their maximum reach more often than he expected, and the taller set would have paid for itself in efficiency in about ten jobs. His second change: he would have installed a second overhead LED work light per bay from the start, rather than adding them piecemeal.

His third and last change was strategic. He would have moved sooner. The full year of restoration revenue his two automotive two post lifts unlocked was, by his own honest math, more than the year of hesitation had cost him in subcontracted work. He said it plainly at the end of the visit — he waited eleven months to say yes and it was the most expensive year of his career. If your version of that decision is currently sitting on your desk, we would rather have the honest financing conversation with you today than eleven months from now. Call us at 800-674-9302 anytime.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email [email protected].

Get in Touch

Schedule Your $1 First Service Call!