When a small RV and trailer restoration shop outside Waukee called us last year, the owner already had the building shell up and a rough idea he wanted automotive two post lifts as the anchor of his bay layout, but he hadn’t sequenced anything else around it yet. Electrical, air lines, floor drain location, even where the welding cart would live — all of it was still up in the air. That’s a common spot to be in, and it’s exactly where we like to get involved, because how you sequence a garage build-out around a two post lift determines whether year one goes smoothly or turns into a series of workarounds.
Compare capacities from 9,000 to 15,000 lbs and get a real installed quote for your Iowa shop before you pour concrete or run electrical.
Why Restoration and Trailer Work Changes the Lift Conversation
Most shops that call us about a standard car lift are thinking about oil changes and brake jobs. Restoration and metal work on RVs and trailers is a different animal. You’re not just raising a vehicle to work underneath it — you’re often cutting out floor sections, replacing frame rails, pulling axles, and needing full unobstructed access to the undercarriage for extended periods, sometimes days at a time. That changes which automotive two post lifts actually make sense for the bay.
We steer these shops toward asymmetric arm configurations with generous drive-through clearance, because trailers and toterhomes are long, and you need room to swing doors and get a cart underneath without fighting the columns. Capacity matters more here too — a lot of restoration work involves an empty chassis that’s lighter than the loaded vehicle, but the tongue weight and frame stress points during cutting and welding aren’t always centered, so we usually recommend sizing up rather than matching the bare curb weight. It’s the same logic we use when a customer tells us they’re lifting a heavy F250 or a loaded box trailer — buy a little more capacity than the spec sheet says you need today.
Sequencing the Build-Out Before the Lift Arrives
The single biggest mistake we see in new restoration shops is pouring concrete and running utilities before locking in the lift footprint. If you’re planning on automotive two post lifts as your primary equipment, that decision needs to happen before the slab is final, not after. We’ve had customers call us after their floor drain was already poured across the middle of the shop, only to realize the post spacing they wanted would sit just a few feet from the drain edge — workable, but it needs to be checked against the anchor bolt pattern and concrete thickness before anyone commits.
Our sequence with a new build is: confirm ceiling height and door clearance first, then nail down the lift model and post spacing, then let that dictate drain location, electrical drops for the power unit, and air line routing if you’re running impact tools nearby. Concrete needs to be rated for the anchoring spec of the lift — thin or patched slabs are the number one reason installs get delayed. If you’re not sure what you’re working with, that’s a normal question for us, not an embarrassing one. We’d rather find out on the phone than have a crew show up and discover the pad won’t hold anchors.
What Install Day Actually Looks Like
Once the shop is ready, install day itself is fairly efficient, but there are a few logistics questions we ask every single time: do you have a forklift or something to unload freight, is there a loading dock or will we need a liftgate truck, and what’s your realistic lead time expectation. Equipment availability varies — sometimes we have units in stock locally in red or blue finishes ready to move, other times it’s a 7 to 10 business day freight window from the manufacturer.
For a restoration shop specifically, we also walk through where the power unit will sit relative to your welding and cutting stations, since you don’t want hydraulic lines running through a high-spark work zone. We anchor the posts, level and shim as needed based on your actual slab, run and test the hydraulics, and cycle the lift under load before we leave. If it’s a two-post configuration with symmetric or asymmetric arms, we set the arm restraints and walk the owner through proper pad placement for trailer frames specifically, since standard car pad points don’t always translate to a boxed trailer chassis.
Handling Long or Unusual Loads on a Two Post Setup
Trailers and RV chassis don’t always sit nicely on standard arm geometry. A gooseneck trailer or a toterhome frame can extend well past where a sedan’s pickup points would be, and the arms need enough reach and swing to get under the frame rails without hitting the axle or suspension components. This is where we spend extra time during the sales conversation, because picking the wrong arm length or reach on automotive two post lifts means the vehicle either won’t fit safely or you’re stuck rigging up plywood and blocks, which is not a permanent solution.
We’ve also worked with shops running a double-wide setup — essentially two lifts side by side for two projects at once, similar to a customer we quoted who wanted to store multiple classic cars without a support post breaking up his garage floor. For a restoration bay, that same double lift layout lets you run one vehicle in teardown while another is in final assembly, which matters a lot when you’re billing by the project instead of the oil change.
Concrete, Drains, and the Realities of an Older Building
A lot of the RV and trailer shops we work with near Waukee aren’t brand new construction — they’re repurposed ag buildings or old shop spaces with concrete of unknown age and thickness. Before we finalize any two post lift quote, we ask about slab thickness, whether there was equipment there previously, and whether there are any drains, trenches, or rebar patterns that could interfere with anchor points. One customer had a lift on the same pad years earlier, which is actually a good sign, but we still verify with a core check or at minimum a visual inspection before assuming the old anchor pattern works for the new automotive two post lifts going in.
If concrete is marginal, we’ll tell you honestly rather than install on a bad pad and have problems six months later. Sometimes that means a small concrete patch or overlay before install day, and we build that into scheduling so it doesn’t hold up your whole timeline.
The First Service Call and What Warranty Actually Covers
Roughly a year after install is usually when we hear from restoration shops again, and it’s rarely an emergency — it’s routine. Cables stretch slightly, hydraulic fluid needs a level check, and safety locks and arm pins get inspected for wear, especially in a shop running heavier or more awkward loads than a typical tire shop. We walk new owners through basic maintenance at install so that first service call is a checkup, not a fire drill.
Warranty coverage varies by brand — ALI-certified lifts from brands we carry generally cover structural components and hydraulics for a defined period, with wear items like cables and pads treated separately. If something does need attention, we handle it directly rather than routing you through a manufacturer call center, since we did the install and know exactly how your shop’s automotive two post lifts are configured.
Planning Ahead for a Growing Shop
Most restoration and trailer shops we work with start with one bay and one lift, then add capacity as the business grows — sometimes a second two post unit, sometimes a four-post or scissor lift for storage or alignment work down the line. If that’s even a possibility for your shop, it’s worth mentioning during the initial quote conversation, because electrical service sizing and floor layout are a lot cheaper to plan for up front than to retrofit later. We’d rather help you build a shop that scales than sell you the smallest setup that gets you through year one and boxes you in after that.

Our Clients Include: