Every year around inspection season, we get a call from a European-marque specialty shop in central Iowa that’s finally ready to add automotive two post lifts to the bay — and almost every one of them has heard some version of the same myth: that a lift shows up on a truck, rolls off on its own wheels, and gets set in place with a pallet jack. It doesn’t work that way, and that misunderstanding causes more delivery-day headaches than any mechanical issue we’ve seen. We’ve installed automotive two post lifts for BMW, Audi, Mercedes, and Volvo specialists all over central Iowa, and the freight and unloading step is where good installs go sideways before the lift even touches the floor.
Browse Rotary and Challenger two post models built for import service bays, then let us handle freight, forklift logistics, and install from start to finish.
Myth 1: “It ships like a car and rolls right off the truck”
This is the single biggest misconception we run into. Automotive two post lifts ship as crated steel — columns, carriages, an overhead beam or cross tube depending on the model, plus a hydraulic power unit — and none of it rolls anywhere on its own. A single two post lift can easily weigh over a thousand pounds once you add the columns together, and the crates are long and awkward, not something two guys wrestle off a lift gate with a pallet jack. When a European specialty shop tells us they’ll just “have someone grab it with the shop truck,” we stop them right there.
What actually needs to happen is a forklift or a loading dock capable of handling long, heavy crates, positioned where the freight truck can actually back in. We ask every customer up front: do you have a forklift on site, or access to one? If not, we arrange it as part of the install, because a driver showing up to a shop with no way to unload isn’t a hypothetical — it’s happened at import shops from Ames to Des Moines, and it turns a scheduled morning delivery into an afternoon of phone calls and rescheduled freight.
Myth 2: Any loading dock or driveway will do
The second myth is that as long as there’s pavement, the truck can get close enough. Freight trucks hauling automotive two post lifts are typically full-size semis, and plenty of European-marque shops we work with are in older buildings, strip-mall service centers, or tight urban lots in central Iowa where a 53-foot trailer simply cannot maneuver. We’ve had installs delayed because nobody checked the turning radius into the lot beforehand.
Before we schedule delivery, we walk through access with the shop: width of the drive, overhead clearance, whether the truck needs to back in or can pull through, and where the crates will sit once they’re off the truck. For a shop doing state inspections on a tight schedule, that planning matters — you don’t want a lift stranded on a trailer at the curb the same week your inspection lane needs to be back online.
Myth 3: “We’ll just use pallet jacks and a couple of guys”
We hear this from shop owners who are trying to save money, and we get it. But automotive two post lifts are dense, top-heavy, and packed in crates that don’t distribute weight the way a pallet of tires does. Attempting to move columns with pallet jacks and manpower alone risks dropping a crate, damaging a column, or hurting someone — and a bent column isn’t something you fix in the field.
A forklift rated for the load, with forks long enough to support the crate fully, is the right tool. If your shop doesn’t have one, that’s fine — we coordinate rental equipment or work with the freight terminal to get it staged correctly. The goal is that when our crew arrives to do the anchor-down and hydraulic hookup, the lift is already sitting where it needs to be, not still shrink-wrapped on a truck in the parking lot.
Why European-marque shops feel this pressure more than most
Import specialty shops in central Iowa run a different rhythm than a general repair shop. State inspection season stacks appointments, and a bay sitting empty because a lift install got pushed a week costs real revenue. We’ve talked to shop owners servicing Audi and BMW fleets who scheduled their two post lift install specifically to land before their busiest inspection stretch, only to have freight logistics almost blow the timeline because nobody planned the unloading.
These shops also tend to run tighter floor plans than a big general-service center — less room to stage crates, less room for error. That’s exactly why we walk every European-marque customer through freight logistics as its own conversation, separate from the lift selection itself. Getting the equipment right matters, but getting it into the building without damage or delay matters just as much when your whole inspection calendar depends on that bay being open on time.
What actually happens on a real freight day
Here’s the sequence we walk shops through so there are no surprises. The freight carrier calls ahead with a delivery window. We confirm forklift access and clear floor space near the bay door. The driver unloads crates directly onto the shop floor or a staging area, and our crew inspects for shipping damage before anything gets uncrated. Only after that do we start layout, anchoring, and hydraulic assembly.
Skipping any one of those steps is where shops get burned. We’ve seen crates accepted and signed for without inspection, only to discover a bent column base weeks later when nobody could prove it happened in transit. For a European specialty shop that can’t afford downtime, having us manage that freight day end-to-end — inspection included — is often the difference between an install that goes smoothly and one that turns into a claims dispute with the carrier.
Concrete, power, and pit questions that come up the same week as freight
Freight logistics rarely arrive alone — they show up bundled with the same questions about concrete thickness, anchor bolt depth, and 220V power that every two post lift install requires. We ask about slab age and thickness before we ever quote freight, because a shop with older concrete may need reinforcement work scheduled before delivery, not after crates are already sitting on the floor waiting.
For European-marque shops specifically, we also confirm ceiling height and door clearance early, since some import lifts run taller overhead beams to clear factory service lifts and specialty jacking points. Getting all of this — freight, concrete readiness, and power — lined up before the truck leaves the terminal is what keeps a two post lift install a one-day event instead of a three-week back-and-forth.
Working with us instead of guessing
We install automotive two post lifts for shops across central Iowa every month, and the ones that go smoothest are the ones where the shop calls us before ordering equipment, not after. We’ll tell you honestly whether your lot can handle a freight truck, whether you need a forklift rental, and what your concrete needs before the lift ever ships. That’s a very different experience than ordering online and hoping a local installer can figure out logistics after the fact.
If you’re a European specialty shop in central Iowa gearing up for inspection season and looking at automotive two post lifts, talk to us before you place the order. We’ll quote the equipment, the freight, and the install together, so the only surprise on delivery day is how fast the bay is back in service.

Our Clients Include: