If you run a heavy-duty truck shop anywhere between Des Moines and the Quad Cities, you’ve probably already looked at the BendPak XPR-10AS for exhaust and driveline work and wondered what it actually costs to get one bolted to your floor and running. Not the sticker price alone — the whole picture, from freight to concrete to the electrician. We install these two-post lifts across the Iowa-Illinois corridor for shops doing exactly this kind of work, and we’ve learned that the guys who plan the full budget upfront are the ones who aren’t surprised three weeks later. Let’s break it down honestly.
See current XPR-Series pricing and availability, then call us for a delivered-and-installed quote specific to your Iowa or Illinois shop address.
Why the XPR-10AS Fits Trucks and Vans With Underbody Work
The BendPak XPR-10AS is a 10,000 lb asymmetric two-post lift, and that asymmetric column offset matters a lot more than most people expect once you’re doing exhaust, transmission, or driveline work on 3/4-ton and 1-ton trucks all day. The arms swing further under the vehicle before you have to reposition, which means your tech isn’t fighting the columns to get a jack or a transmission stand where it needs to go. For a shop that’s constantly pulling driveshafts, dropping exhaust systems, or servicing u-joints, that extra working room under the frame rails adds up over a full day of ticket volume.
The double-telescoping screw pads on the XPR-10AS also let you get symmetric-style pad placement on trucks with unusual frame contact points, which is common on service bodies and upfitted work trucks running around the corridor. We’ve set these up for fleet shops in eastern Iowa servicing municipal trucks and for independent diesel shops near the Illinois line, and in both cases the arm geometry was the deciding factor over a straight symmetric lift. If your bay sees a mix of pickups, vans, and the occasional car, the XPR-10AS flexes for all of it without needing a second lift style.
Site Survey: What We Actually Check Before Quoting Your Install
Before we ever quote installation on a BendPak XPR-10AS, we walk the bay. Ceiling height is the first thing — this lift needs enough overhead clearance for a raised truck plus the columns themselves, and older Iowa and Illinois shop buildings sometimes have lower trusses or ductwork that changes where the lift can actually go. We also check for overhead doors, sprinkler heads, and lighting fixtures that might conflict with a truck sitting at full rise.
Floor condition is the second big piece. A 10,000 lb two-post lift needs a slab that meets BendPak’s minimum thickness and PSI spec, and a lot of older buildings along this corridor have patched or thin sections near the front of the bay where trucks used to idle. We core-check or ask about slab history before committing to a spot, because moving a planned install location after the anchors are already ordered costs everybody time. Electrical is the third check — the XPR-10AS needs a dedicated circuit sized correctly for the power unit, and plenty of older shops need a subpanel run before we can even schedule the lift itself.
Cost Breakdown: Lift, Freight, Site Prep, and Labor
Here’s roughly how the money breaks out on a typical BendPak XPR-10AS project in this region. The lift itself sits in a mid-range bracket for a 10,000 lb asymmetric two-post unit — expect a noticeably higher number than an entry symmetric lift because of the telescoping arm design and expandable top beam. Freight varies by how far you are from the distribution point and whether you’ve got a forklift or loading dock on site; shops without unloading equipment usually pay more because we have to bring a lift gate truck or coordinate a rigging crew.
Site prep is where costs swing the most. If your floor and electrical are already good to go, you’re looking at a standard install labor charge. If we need to pour a new footing pad, break out and patch old concrete, or run new electrical service, those add real line items — sometimes rivaling the cost of the lift’s install labor itself. We always quote these separately so you can see exactly what’s driving the number, rather than one lump figure that hides where the money’s going. Anchoring, leveling, and startup testing round out the labor side, and we don’t sign off until the lift’s been cycled empty and loaded to confirm it’s within BendPak spec.
Concrete and Anchoring Realities Specific to Older Buildings
A lot of the shops we work with in the corridor are in buildings that are decades old, originally built for lighter-duty work than what’s happening in them now. That means the concrete under a proposed BendPak XPR-10AS location isn’t always rated for a 10,000 lb capacity two-post lift with columns bearing full load at extension. We’ve had to walk away from install locations more than once because the existing slab simply wasn’t going to hold up long-term, even though the anchors would technically set.
When a new pad is needed, we coordinate the cross-section and footing depth with whatever’s already in the ground — utility lines, old footings from prior equipment, in-floor heat lines in shops that have them. That’s a real conversation we have on nearly every commercial install: where exactly the heat lines run so we don’t drill into anything expensive. Getting this right before the lift shows up saves a redo, and it’s part of why we walk every site rather than quoting off a floor plan alone.
Choosing 10,000 Lb Capacity Versus Stepping Up
We get asked constantly whether a shop should just go straight to a 12,000 lb lift instead of the XPR-10AS. For most pickup and van work — even loaded service trucks without a full box of tools and heavy equipment mounted — the 10,000 lb capacity of the XPR-10AS is plenty. The jump in price to a 12K unit is real, and unless you’re regularly lifting trucks with permanent job boxes, cranes, or heavy aftermarket bumpers and winches pushing weight past the 10K threshold, that extra spend usually isn’t buying you anything you’ll use.
Where we do steer shops toward the next capacity up is when the fleet mix includes one-ton duallies loaded with fuel, tools, and equipment on a regular basis, or medium-duty box trucks. If that’s an occasional vehicle rather than your daily bread and butter, it often makes more sense to keep the XPR-10AS for your main bays and route the rare heavy unit to a mobile column set or a higher-capacity lift elsewhere in the shop.
Rise Height and Arm Extensions for Full-Size Work
One detail that gets overlooked until install day is rise height and how it interacts with driveline and exhaust work specifically. Techs doing this kind of underbody service all day don’t want to be crouched under the vehicle — they want to walk under it comfortably. The BendPak XPR-10AS gives good working height, but if your bay has the ceiling clearance, it’s worth discussing arm extensions at quote time rather than after the lift’s already anchored.
Two-foot, four-foot, and even six-foot arm extension options exist for reaching further under longer wheelbase trucks and vans, and they’re a much smaller add-on cost than most shop owners expect. We typically quote a shop the base configuration alongside an extended-arm option side by side, so the decision comes down to actual working comfort and vehicle mix rather than guessing after the fact. For a corridor shop running full-size trucks daily, this is worth the extra conversation.
Getting a Straight Quote for Your Shop
The honest truth is that no two BendPak XPR-10AS installs in this corridor cost exactly the same, because no two buildings are the same. A shop with a clean slab, existing 220V service nearby, and dock access is going to spend meaningfully less than a shop needing new concrete and a subpanel. We’d rather walk your site, tell you the real number split by category, and let you decide where to spend than hand you one flat figure that falls apart once we’re on-site.
If you’re weighing the XPR-10AS against other two-post options for a heavy-duty truck bay in Iowa or Illinois, we’re glad to talk through capacity, arm configuration, and what your specific building will need before you commit to anything. For more on choosing between lift types, see our guides on two-post lift capacity and concrete requirements for commercial lift installs elsewhere on our site.

Our Clients Include: