Servicing a Challenger CLFP9 and looking for parts? We stock the wear items and the hard-to-find pieces for this 2-post, and we map every one of them on a visual parts breakdown so you can see exactly which item you need before you order. Here is what to know when buying challenger clfp9 parts, and where to see every part mapped visually.
See the full challenger clfp9 parts breakdown, mapped visually
The fastest way to find the right part: open the Challenger CLFP9 parts breakdown – it shows the manufacturer-style exploded drawing with every item numbered, matched to a parts table with 17 orderable parts. Find your part on the drawing, click it in the table, and it goes straight to a cart. It is the same parts-book layout our own techs use in the field, so what you see is what we would look at on the phone with you.
What we stock for the challenger clfp9 parts
The most-requested items: POWER / IDLER CABLE (B26052), FEMALE ARM SHIM (CS1020-03-01), FOOT PAD ASSEMBLY (items 72-77) (B2270), FOOT PAD WELD (A1101-1H), and INNER GEAR (ARM RESTRAINT) (A1070TC). Those are the headline parts – the full set of 17 orderable items lives on the visual breakdown.
How to identify the right part
The trickiest part of buying challenger clfp9 parts is confirming the correct SKU for your specific configuration. The same lift model across different production years or height variants can take different cables, arms, or sheaves. Check the data plate on the column for the full model string and serial before ordering – or open the breakdown above and match your part against the drawing. When in doubt, call with the plate photo and we confirm before we ship.
Cross-reference part numbers
A lot of challenger clfp9 parts carries more than one part number – the manufacturer’s original plus one or more aftermarket references. We keep those cross-references, so a call with any of the numbers gets you to the right part. If you have an old invoice with a legacy SKU on it, we can trace it forward to the current equivalent.
Install and safety notes
Cables, sheaves, and lock components on any challenger clfp9 parts are safety-critical. Replace cables at the manufacturer’s interval or when you see fraying, kinks, or corrosion – never wait for a failure. Sheaves wear alongside cables and should be inspected in the same service. Locks that do not click cleanly are a hard stop: do not use the lift until they are fixed. Unsure whether a part is still safe? Send a photo rather than guess.
Buy the challenger clfp9 parts from a crew that services these lifts
The reason to buy challenger clfp9 parts from us instead of a marketplace: we install and repair these lifts for a living. That means knowing which parts commonly fail together, which cross-references actually fit, and which knock-offs to avoid. When you call mid-install with a question, the phone gets answered by people who have done the job.
Delivery, install, and service
Most challenger clfp9 parts ships within a few days of ordering. For local Iowa customers we install parts on site or bring the lift in; for everyone else we ship, answer technical questions on the phone, and coordinate service where it makes sense. Open the CLFP9 breakdown any time to see the drawing again, or start at our parts lookup and pick your manufacturer and model.
Get the right part
The clean way to buy challenger clfp9 parts: open the visual breakdown, find your part on the drawing, and order it right there – or call 800-674-9302 with your lift’s model plate and serial and we will confirm the right SKU before anything ships. We would rather ask the questions now than see a returned box next week.
Where we work
We are based in Iowa and support shops across the country. Some work we do on site regionally; for the rest of the U.S. we handle equipment, parts, and phone diagnosis, and we coordinate service calls where it makes sense. Call and we will tell you honestly what we can do for your location.
We would rather give you a straight answer than overpromise a truck roll that does not make sense. Tell us where you are and what you need.
Challenger Clfp9 Parts – FAQ
How do I know which specific part I need?
Open the visual parts breakdown for your model – every part is numbered on the drawing and matched to an orderable SKU in the table. Or call with your lift's model plate and serial and we confirm before shipping.
Do you carry cross-references from other suppliers?
Yes. Most lift parts carry multiple part numbers. We match legacy or aftermarket SKUs to the current equivalent.
How fast do parts ship?
Most in-stock parts ship within a couple business days. If the shop is down, tell us – rush options exist for most items.
Can you install the part on my lift?
For Iowa shops, yes – on site or in our shop. For everyone else we ship the part and support the install by phone.
Need challenger clfp9 parts? Open the visual parts breakdown to see every part mapped on the drawing, or call 800-674-9302 with your lift’s model plate and we will confirm the right part and ship it fast.
Related services

Josiah Ragsdale
Founder, Automotive Lift Services
Josiah has installed, repaired, and inspected automotive lifts and hydraulic equipment since he was 18. He founded Automotive Lift Services in Iowa, and his team now serves shops, dealerships, and fleets across the state and nationwide. Read more
Challenger CLFP9 specifications (from the install manual)
- Capacity: 9,000 lbs (2,250 lbs per arm)
- Column height / overall width: 120 7/8″ columns, 137 1/2″ overall width
- Rise height (screw pads at highest position): 78 1/8″; screw pad height 4″ to 5 7/8″
- Inside of columns / drive-thru: 109″ inside columns, 98 3/16″ drive-thru clearance
- Ceiling height needed: 121 7/8″
- Lifting time: about 50 seconds
- Electrical: 2HP single phase 60Hz 208/230V (optional 2HP three phase 50/60Hz for 208, 230, or 460V); standard power unit needs a dedicated 25-amp double-pole, double-throw breaker to run at full capacity
- Concrete requirement: 4″ minimum depth with steel reinforcement, 3500 psi, cured 28 days; floor level within 3/8″ over the install area; no anchor within 8″ of a crack, edge, or expansion joint
- Anchoring: column anchors torqued to 150 ft-lbs at install, 80 ft-lbs monthly; drive-over plate held by 3/8″ x 5″ anchors
Install notes from the manual
Drill the column anchor holes with a 3/4″ carbide bit using the base plates as templates, through the floor if possible or 4″ minimum, and set the five exposed anchors on each column before raising the carriages. When routing the cables, make sure the top of each hydraulic cylinder stays retained in the opening of the carriage top plate — the manual flags this as an injury risk if missed. On the drive-over plate, snug the 3/8″ x 5″ anchors only until the plate is secure; over-tightening dimples it. Pressure-test by running the motor 10 seconds past full rise and checking for leaks, and expect the factory anti-corrosive lubricant to weep off the cylinder rods on the first full-rise cycles — wipe it off so it isn’t mistaken for a leak. Check the lock release daily: the idler lock should rest firmly against the back of the column when engaged.
Source: the manufacturer’s installation and operation manual for the CLFP9. Call 800-674-9302 if you need the full manual for your production year.

Our Clients Include: