Servicing a Challenger E15 and looking for parts? We stock the wear items and the hard-to-find pieces for this 2-post, and we map every one of them on a visual parts breakdown so you can see exactly which item you need before you order. Here is what to know when buying challenger e15 parts, and where to see every part mapped visually.
See the full challenger e15 parts breakdown, mapped visually
The fastest way to find the right part: open the Challenger E15 parts breakdown – it shows the manufacturer-style exploded drawing with every item numbered, matched to a parts table with 35 orderable parts. Find your part on the drawing, click it in the table, and it goes straight to a cart. It is the same parts-book layout our own techs use in the field, so what you see is what we would look at on the phone with you.
What we stock for the challenger e15 parts
The most-requested items: SYNCHRONIZER CABLE (E15-04-00), 87 ARM PIN (JSJ6-11), 9/16-18 UN POWER CYLINDER HOSE (JSJ4-16), LIMIT SWITCH PACKAGE (INCLUDES SWITCH w/ CORD, BOTH BRACKETS, & ITEMS 6-9) (B2064-01), and OVERHEAD SHUT OFF BAR (A2067). Those are the headline parts – the full set of 35 orderable items lives on the visual breakdown.
How to identify the right part
The trickiest part of buying challenger e15 parts is confirming the correct SKU for your specific configuration. The same lift model across different production years or height variants can take different cables, arms, or sheaves. Check the data plate on the column for the full model string and serial before ordering – or open the breakdown above and match your part against the drawing. When in doubt, call with the plate photo and we confirm before we ship.
Cross-reference part numbers
A lot of challenger e15 parts carries more than one part number – the manufacturer’s original plus one or more aftermarket references. We keep those cross-references, so a call with any of the numbers gets you to the right part. If you have an old invoice with a legacy SKU on it, we can trace it forward to the current equivalent.
Install and safety notes
Cables, sheaves, and lock components on any challenger e15 parts are safety-critical. Replace cables at the manufacturer’s interval or when you see fraying, kinks, or corrosion – never wait for a failure. Sheaves wear alongside cables and should be inspected in the same service. Locks that do not click cleanly are a hard stop: do not use the lift until they are fixed. Unsure whether a part is still safe? Send a photo rather than guess.
Buy the challenger e15 parts from a crew that services these lifts
The reason to buy challenger e15 parts from us instead of a marketplace: we install and repair these lifts for a living. That means knowing which parts commonly fail together, which cross-references actually fit, and which knock-offs to avoid. When you call mid-install with a question, the phone gets answered by people who have done the job.
Delivery, install, and service
Most challenger e15 parts ships within a few days of ordering. For local Iowa customers we install parts on site or bring the lift in; for everyone else we ship, answer technical questions on the phone, and coordinate service where it makes sense. Open the E15 breakdown any time to see the drawing again, or start at our parts lookup and pick your manufacturer and model.
Get the right part
The clean way to buy challenger e15 parts: open the visual breakdown, find your part on the drawing, and order it right there – or call 800-674-9302 with your lift’s model plate and serial and we will confirm the right SKU before anything ships. We would rather ask the questions now than see a returned box next week.
Where we work
We are based in Iowa and support shops across the country. Some work we do on site regionally; for the rest of the U.S. we handle equipment, parts, and phone diagnosis, and we coordinate service calls where it makes sense. Call and we will tell you honestly what we can do for your location.
We would rather give you a straight answer than overpromise a truck roll that does not make sense. Tell us where you are and what you need.
Challenger E15 Parts – FAQ
Can you install the part on my lift?
For Iowa shops, yes – on site or in our shop. For everyone else we ship the part and support the install by phone.
How do I know which specific part I need?
Open the visual parts breakdown for your model – every part is numbered on the drawing and matched to an orderable SKU in the table. Or call with your lift's model plate and serial and we confirm before shipping.
Do you carry cross-references from other suppliers?
Yes. Most lift parts carry multiple part numbers. We match legacy or aftermarket SKUs to the current equivalent.
How fast do parts ship?
Most in-stock parts ship within a couple business days. If the shop is down, tell us – rush options exist for most items.
Need challenger e15 parts? Open the visual parts breakdown to see every part mapped on the drawing, or call 800-674-9302 with your lift’s model plate and we will confirm the right part and ship it fast.
Related services

Josiah Ragsdale
Founder, Automotive Lift Services
Josiah has installed, repaired, and inspected automotive lifts and hydraulic equipment since he was 18. He founded Automotive Lift Services in Iowa, and his team now serves shops, dealerships, and fleets across the state and nationwide. Read more
Challenger E15 specifications (from the install manual)
- Capacity: 15,000 lbs (3,750 lbs per arm)
- Rise height (screw pads at highest position): 77 3/4″ (1975 mm)
- Overall height: 14′-6″ (4420 mm) or 16′-6″ (5030 mm)
- Overall width / drive-thru: 147 1/16″ (3735 mm) wide, 109 3/8″ (2778 mm) drive-thru clearance
- Ceiling height needed: 175″ (4445 mm) or 199″ (5055 mm) depending on height setting
- Speed of rise: about 75 seconds
- Electrical: 2HP single phase 50/60Hz, 208-230V; three-phase power unit factory-wired for 240V
- Concrete requirement: 4″ minimum depth with steel reinforcement, 3500 psi, cured 28 days; floor level within 3/8″ over the install area; no anchor within 8″ of a crack, edge, or expansion joint
- Anchoring: 3/4″ carbide bit, holes through the floor or 5″ minimum; shim no more than 1/2″ at any point; torque to 150 ft-lbs at install, 80 ft-lbs monthly
Install notes from the manual
Chalk the column layout lines at the Overall Width dimension within 1/8″ tolerance and plumb the columns with a level at least 24″ long — never stacking more than 1/2″ of shims at any point. To rope the synchronizer cables you disassemble the cable trapping rods at the upper beam sheaves and remove the bottom column sheaves, then reassemble once the cable is seated. Bleed the hydraulics idler side first: crack the bleed plug on top of the cylinder, repeat on the power side, raise 6 inches, and repeat until no air escapes. Wipe the cylinder rods after the first full-rise cycles — the shipping lubricant pushed out through the wiper looks like a leak if you leave it. Monthly, re-torque the anchors to 80 ft-lbs and grease all four carriage slide-track corners on both columns.
Source: the manufacturer’s installation and operation manual for the E15. Call 800-674-9302 if you need the full manual for your production year.

Our Clients Include: