Looking for an Automotive Lift for sale? 

Experience America’s Highest and Most Reviewed Car Lift Installation, Repair, Inspection, and Hydraulic Cylinder Service Company Today!

Car Lift Repair Ames Stars

Read Reviews Buy a Lift

Our Clients Include:Social Proof Car Lift Repair Ames Auto Lift Services

Automotive Two Post Lifts: Freight, Forklifts, and Fluid Service Bays

Alignment Machine For Sale Boca Raton, FL

Contact Us

Most of the headaches we hear about with automotive two post lifts have nothing to do with the lift itself — they start on the day the freight truck shows up. A small-fleet operator outside Dubuque called us last spring running eight service vans and a handful of half-tons, doing all his own oil changes and fluid service in a two-bay shop. He had picked out equipment, he had a concrete slab, and he had no forklift, no dock, and a driveway that sloped away from the overhead door. That combination turns a straightforward install into a two-day problem. We are based in Ames, we install and stock parts for every major brand, and we spend as much time planning the unload as we do the anchor layout.

Shop 2-Post Lifts →

Rotary and Challenger two-post packages in 10,000 and 12,000 lb capacities, with clearfloor and baseplate options. Call us before you order and we will help you plan the freight, the unload, and the anchor layout for your building.

What Actually Arrives on the Truck

A two-post lift does not show up as one tidy crate. Typically you get two columns strapped to a pallet or banded together as a single long bundle, a carton of arms, a carton of hardware and hydraulics, and either an overhead beam assembly or a floor plate depending on the configuration. Column weight is the number that matters. A 10,000 lb capacity column runs in the neighborhood of 500 to 700 pounds each, and a 12,000 lb column can push past 800. Bundled together on a pallet, you are looking at 1,400 to 1,900 pounds of freight coming off a 53-foot trailer.

LTL carriers deliver curbside. That is the entire scope of the service unless you pay for more. The driver will operate a liftgate if one was ordered, and a liftgate is rated somewhere around 2,500 to 3,000 pounds, which is usually enough — but liftgate service has to be requested at the time the order is placed, not when the truck is idling in your lot. We have had customers refuse delivery because the trailer showed up without one. On the Dubuque job we specified liftgate plus a call-ahead so the shop owner could line up help, and the whole unload took under twenty minutes. Planning that detail up front is the cheapest insurance in the entire project.

Forklift, Skid Steer, or Neither

If you have a forklift on site, the freight question is basically solved. Set the forks wide, take the pallet off the liftgate, and stage it inside where the columns are protected from weather. One customer in northern Missouri told us he had a forklift and five inches of concrete, which meant his unload was trivial and his anchoring was the part we needed to think about. That is the ideal order of problems to have.

Without a forklift, the options get creative but they are all workable. A skid steer with pallet forks handles the job fine. So does a tractor with a loader if the bucket has forks or a clamp. We have also unloaded columns one at a time by cutting the bands on the trailer, standing a column upright on the liftgate, and walking it down with two people and a column dolly — slow, but safe, and it does not require equipment you do not own. What we tell people not to do is improvise with straps and a pickup hitch. A column that tips is a broken foot at best. On the Dubuque fleet shop we borrowed a skid steer from a neighboring business for the morning, which is a solution more Iowa shops have available than they realize. Ask around before you rent something.

Configuration One: Clearfloor Overhead for a Van Fleet

The first configuration we priced for the Dubuque operator was a clearfloor two-post with an overhead beam, 12,000 lb capacity, asymmetric arms. Clearfloor means nothing crosses the bay floor between the columns — you roll a drain pan, a creeper, or a transmission jack anywhere you want. For a shop doing high-volume oil changes and fluid service, that open floor is worth real money in wasted steps saved over a year.

The catch is ceiling height. The overhead beam carries the equalization cables and the shutoff bar, and it sits above the columns. On a 12,000 lb clearfloor unit you generally want at least twelve feet of clear ceiling, and fourteen is better if you intend to raise a cargo van to full height. His building had a fourteen-foot sidewall in one bay and eleven in the other, which immediately narrowed where the equipment could go. We also had to route the overhead so it cleared an existing air line and a light fixture, both of which got moved. Among automotive two post lifts, the clearfloor overhead is the configuration most shops want and the one most often blocked by something already bolted to the ceiling. Measure to the lowest obstruction, not to the peak of the roof, and measure it before you order anything.

Configuration Two: Baseplate for a Low Ceiling

The second configuration was a baseplate model. Instead of running the cables overhead, a baseplate lift routes them through a low channel across the floor between the columns. That channel is only an inch or two tall and it is ramped on both sides, so you can roll a floor jack over it, but you will feel it and you will occasionally catch a drain pan on it. In exchange, you can install under a ceiling as low as about ten feet.

We get this call constantly. A shop in Grand Forks told us flatly that he could not do an overhead — his maximum height was 139 inches, his heaviest vehicle was 6,000 pounds, and he wanted a 9,000 lb baseplate unit under a tight budget. That is exactly the scenario baseplate exists for, and it is a legitimate choice, not a downgrade. For the Dubuque fleet shop, the baseplate option would have let him use the eleven-foot bay he already had rather than reworking the ceiling in the tall bay. He ultimately went the other direction, but it was close. When we compare automotive two post lifts for a customer, we lay both configurations side by side on capacity, ceiling requirement, floor obstruction, and total installed cost, and let the building decide. The building almost always has an opinion.

Concrete: The Part Nobody Budgets For

Anchor holding power is the whole safety story on a two-post. The manufacturer will specify a minimum — commonly four inches of 3,000 PSI concrete for a 10,000 lb unit, with more required as capacity climbs. Anything less and the anchors do not develop full pullout strength, and a column that shifts under load is not a theoretical concern.

The problem is that almost nobody knows what their slab actually is. “About five inches, but maybe less” is the most common answer we get, and it was close to what the Dubuque shop told us. Old pole-building slabs in eastern Iowa are frequently four inches at the door and thin toward the middle, sometimes poured over fill that settled. We core-test when there is any doubt. If the slab does not make spec, the fix is a pad pour: saw-cut a section roughly four by twelve feet under each column area, dig out, tie in rebar, and pour to depth. It adds a few days and a mid-four-figure line item on most jobs, and it is not optional. We have walked away from installs where an owner wanted us to anchor into three inches of cracked concrete. Among the automotive two post lifts we install every year, the ones that give trouble a decade later are almost always the ones that were bolted to marginal slabs.

Setting Up for Oil and Fluid Service Specifically

A fleet shop doing oil changes all day uses a lift differently than a general repair shop. The vehicle goes up, comes down, and goes up again dozens of times per week, and nobody needs full height — most drain-and-fill work happens at chest level. That usage pattern changes what you should buy and how you should set it up.

First, prioritize cycle speed and arm geometry over maximum capacity. Asymmetric arms with a short front swing let you open the driver’s door with the vehicle in the air, which matters when a tech is climbing in to check a reset. Second, plan your fluid handling before the lift lands. Bulk oil reels dropped from the ceiling behind the columns keep hoses out of the drive path, and a waste-oil drain on a rolling stand needs a clear lane under the vehicle — which is a strong argument for the clearfloor configuration in a fluid-service bay. Third, do not skip the arm restraints or run the lift with worn restraint gears; on high-cycle equipment those wear faster than owners expect. We service a lot of automotive two post lifts in fleet shops around eastern Iowa and the wear pattern is consistent: cables, arm restraints, and lock pawls, in that order. Budget for a cable set around year eight and you will not be caught off guard.

How We Sequence a Dubuque Install

Once the configuration is settled, the sequence is fixed and we do not deviate from it. Site visit or detailed photo review first, then core test if concrete is questionable, then the order goes in with liftgate and call-ahead specified. Freight from the manufacturer to eastern Iowa typically runs one to three weeks depending on brand and whether the model is in stock at a regional warehouse. We stage the delivery for a day the shop can spare the bay.

On install day, we lay out anchor positions from the manufacturer’s template, verify column spacing against the widest vehicle in the fleet, drill and set anchors, plumb both columns with shims, route hydraulics, fill and bleed the power unit, and cycle the equipment unloaded through its full travel several times. Then we load-test with an actual vehicle and walk the owner and every tech through the lock engagement sound, the arm restraint check, and the correct lifting points for the vehicles they actually service. We leave the manual on site and we register the warranty for you. The Dubuque job ran a single day because the unload was planned and the slab checked out. For related reading, see our guides on two-post lift concrete requirements, clearfloor vs. baseplate configurations, and lift cable replacement intervals. If you are comparing automotive two post lifts for a fleet bay, call us before you order — the freight plan is easier to fix in advance than in your parking lot.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email founder@autoliftserv.com.

Get in Touch

Schedule Your $1 First Service Call!