Looking for an Automotive Lift for sale? 

Experience America’s Highest and Most Reviewed Car Lift Installation, Repair, Inspection, and Hydraulic Cylinder Service Company Today!

Car Lift Repair Ames Stars

Read Reviews Buy a Lift

Our Clients Include:Social Proof Car Lift Repair Ames Auto Lift Services

Lift Installation Day Checklist: What to Have Ready

Alignment Machine For Sale Boca Raton, FL

Contact Us

A solid lift installation day checklist is the difference between a two-hour job and a two-day headache. We’ve shown up to plenty of Iowa shops and home garages where the crew was ready, the concrete was tested, and the bay was cleared — and we’ve shown up to just as many where nobody moved a toolbox off the slab and the electrician hadn’t even been called yet. Auto Lift Services installs Rotary, Challenger, BendPak, and Atlas lifts across the state, and this checklist is exactly what our own crews confirm before we load the truck. Run through it a few days ahead, not the morning of.

Talk to Our Install Team →

Not sure if your bay is ready? Send us a photo and your slab specs and we’ll tell you what to fix before installation day.

Confirm the Concrete Before Anything Else

Every lift installation day checklist starts underground, because no amount of scheduling matters if the slab can’t hold anchors. We ask for slab thickness, age, and whether it’s been patched or overlaid. Most 2-post and 4-post lifts need a minimum of 4 inches of properly cured structural concrete without heavy crack, patch, or expansion joints running through the anchor pattern. Older Iowa shop floors, especially ones poured in stages or over old sub-floors, are notorious for issues that don’t show until an anchor is halfway set.

If your slab is questionable, we’d rather find that out on a phone call than after our installer arrives with a truck full of lift components. Have your slab thickness, pour date, and any known repair history ready when you schedule. If you don’t know the details, we can walk you through checking it yourself or send someone out for a quick concrete inspection. This single step prevents more delayed lift installation appointments than anything else on our list.

Clear the Bay Completely

This sounds obvious, but it’s the item we chase down the most on the morning of an install. The bay needs to be empty — no parked vehicles, no parts shelving, no tire racks, no floor jacks left mid-aisle. Our crews need full access to the anchor locations and enough clearance to maneuver columns, arms, and the overhead beam or hydraulic unit into place.

For 2-post and 4-post lifts specifically, we also need overhead clearance confirmed. Check for HVAC ductwork, light fixtures, sprinkler heads, and low ceiling beams above the intended lift location. A shop lift installation checklist that skips overhead clearance is incomplete — we’ve had to reroute ductwork on install day more than once because nobody measured up. If you’re working from a printed plan, walk the actual space with a tape measure before we arrive, not just the blueprint.

Verify Power Requirements Match the Lift

Hydraulic lifts need dedicated electrical circuits sized to the power unit, and the voltage, amperage, and circuit type have to be confirmed before installation day, not during it. Most shop lifts run on 220-volt single phase, but heavier commercial units and some four-post configurations call for three-phase power. If your building doesn’t already have the right service run to the bay, that’s an electrician’s job, and it needs to happen before our crew shows up ready to wire in the power unit.

We include the exact electrical spec sheet with every lift we sell so your electrician has real numbers instead of guesswork. Confirm the outlet or junction box location relative to where the power unit will actually sit — cord length and conduit routing matter more than people expect. A lift installation day checklist that has power confirmed a week ahead saves us from standing around waiting on a licensed electrician who wasn’t scheduled.

Have Your Paperwork and Model Info Ready

We need the exact model number, any customization options ordered, and your original invoice or order confirmation available on installation day. This isn’t bureaucracy — it tells our installer which arm configuration, cable routing, and anchor kit came with your specific unit. Lifts ordered with adapters, extended arms, or specific pad kits sometimes ship components separately, and having the paperwork on hand lets us verify everything arrived before we start assembly.

If this is a warranty install or you’re financing through a dealer, have that documentation accessible too. We’ve had installs stall because nobody could confirm which lift model was actually delivered versus what was ordered. Keep the packing slip, the model plate photo, and your invoice together in one folder — five minutes of organization on your end saves our crew from phone calls back to the shop mid-install.

Line Up a Second Set of Hands

Most lift installs move faster with someone from your team present, even if our crew does all the technical work. Having an owner or shop manager on-site to make quick decisions about exact placement, answer questions about your specific vehicle mix, and sign off on anchor locations keeps the job moving. We’ve had installs where nobody was authorized to approve a placement adjustment, and the whole crew sat idle waiting on a phone call to an owner who was out of state.

This matters even more for a scissor lift installation checklist, since scissor and mid-rise units often go into tighter, multi-use spaces where placement affects daily workflow more than a standard 2-post bay. Decide ahead of time who’s authorized to make that call on installation day, and make sure they’re actually reachable, not just scheduled to be.

Plan for Curing and Testing Time

Anchors need proper cure time before the lift can be load-tested and put into service — this isn’t a step we skip to save time. Depending on the anchor system and adhesive used, that curing window can run anywhere from a few hours to overnight. Don’t schedule a vehicle to go up on the lift the same afternoon as installation; build in the buffer.

Once cured, we run a full load test and function check — up and down cycles, safety lock engagement, arm restraint testing, and a walk-around inspection. This is also when we cover basic maintenance with your team: what to grease, what to inspect weekly, and when your first service check should happen. Treat this final step as part of the checklist too, not an afterthought after the crew leaves.

Double-Check Everything a Few Days Out

The single biggest failure point we see isn’t any one item on a lift installation day checklist — it’s running through the list too late to fix problems. Confirm slab, clearance, power, paperwork, and personnel a few days before your scheduled date, not the morning of. That gives you time to call an electrician, move inventory, or track down a missing packing slip without pushing the install date.

We’ve built our scheduling process around this because a delayed install costs everyone time — our crew, your shop, and any customers waiting on that bay. Whether you’re working from our lift installation checklist or a general shop lift installation checklist you found elsewhere, the principle is the same: confirm early, confirm in writing, and don’t assume anything is ready until you’ve checked it yourself.

About the Author

Josiah Ragsdale is the founder of Auto Lift Services. Based in Ames, Iowa, our team installs, services, and stocks parts for every major lift brand — from a home-garage 4-post through 30,000 lb commercial and 40K+ heavy-duty. Have a question or need a quote? Call 800-674-9302 or email [email protected].

Get in Touch

Schedule Your $1 First Service Call!